
Installation
InstallationTools NeededThe only tool needed for the installation is a small,
1.If the DAC960PG or DAC960PJ is not already removed from the system, power down the system and then remove the DAC960PG or DAC960PJ.
WARNING
Disconnect the system from the electrical wall outlet before opening the system cabinet. Working with the system covers off and power applied to the system can result in shock and serious injury.
2.Remove the loopback plug from J5 on the DAC960PG or DAC960PJ. Keep the loopback plug in a safe place, in case the BBU needs to be removed at a later time.
DAC960PG and DAC960PJ Installation Guide |