X223W

INSTALLATION

To install the monitor to your host system, please follow the steps as given below:

Steps

1.1-1 Connect Video Cable

a.Make sure both the monitor and computer are powered-OFF.

b.Connect the VGA video cable to the computer.

1-2 Digital Cable (Only Dual-Input Model)

a. Make sure both the monitor and computer are powered-OFF. b. Connect one end of the 24-pin DVI cable to the back of the monitor and connect the other end to the computer’s port.

2.Connect power cord

Connect the power cord to the monitor, then to a properly grounded AC outlet.

3.Power-ON Monitor and Computer

Power-ON the monitor first, then power-ON the computer. This sequence is very important.

4.If the monitor still does not function properly, please refer to the troubleshooting section to diagnose the problem.

EN-12

Page 13
Image 13
Acer X223W manual Installation, EN-12