Y1-03-0229C 9
SECTION 5 - MAINTENANCE
The following maintenance schedule is recommended:
Action
Description
Frequency
Visual inspection
Inspect the antenna, cables and
connections. Ensure that the cable is
attached properly and the unit has not been
damaged.
Every 6 months
Performance
test
Verify that the system is operating by
using the training mode with a training
beacon
Every year
Clean exterior
Using a mild, sudsy solution suc h as
dishwashing liquid, wipe the surface of
the ARX-50 with a damp cloth to
remove film, salt and sand
As needed
APPENDIX A - SPECIFICATIONS
General
Carrier frequency
Sensitivity
VHF antenna
Modulation
Electrical input power
Alert methods
Regulation conformity
Safety
EMI/EMC
RoHS/WEEE
Physical
Dimensions
Weather resistance
Operating temperature
Storage temperature
Weight