Page 2 of 2
Do Items Below in The Order Listed | For Details Go To |
4.Momentarily press the LMPTST switch on the APU front panel and verify that all indicators light.
5. | Connect terminal equipment to Craft port on the front of the MPU. | |
6. | Log on to the Craft Interface. | |
7. | Clear Alarm History. | |
8. | Enter Target Identifier and set date and time now or during |
|
| provisioning (the | |
9. | Configure DS3 MUX as required. | |
10. | Configure HLXC modules as required. | |
11. | Check the HLXC to HLXR voltage and current: |
|
| • Version C HLXC to HLXR Voltage and Current Test. | |
| • Version D (or Later) HLXC to HLXR Voltage and Current Test. | |
12. | Connect the test equipment at both ends of the system and perform an |
|
|
13. If the DS3 MUX protect module is installed:
• Execute Force/APS commands through the Craft Interface. |
•Perform Manual (Force) Switch to Protect test on DS3 MUX
module. | |
• Perform APS test on DS3 MUX module. |
14.Coordinate the test with a technician located at the remote end of the circuit and ensure test procedures there have been completed. Refer to the Soneplex Version D HLXR Remote System Operation and Maintenance Manual, listed under Related Publications at the beginning of this manual.
15.At both ends of the circuit, make any necessary
| the distribution frames. | |
16. | Log off from the Craft Interface system. | |
17. | Complete assignment forms and update office records as required by |
|
| local procedures. |