Issue 2, January 1998
6.07Coil the service loop clockwise (if the fiber entry is from the right) or
6.08Place the splice tray in the center of the drawer and push the drawer into the chassis.
6.09Record the cable fiber identification on the designation label attached to the front cover.
6.10Repeat steps 6.02 through 6.09 for additional splice trays as required.
7. SYSTEM INTEGRATION SERVICES
7.01ADC offers the following system integration services. For calls originating in the U.S.A. or Canada, dial
Technical Assistance Center | • | Product Management |
| • | Project Engineering |
| • | Project Administration |
| • | Network Design |
| • Broadband Design (RF Design and Strand Mapping) | |
| • | Integration Network Testing |
| • Network Monitoring (Upstream or Downstream) | |
| • | Power Monitoring |
| • | Remote Surveillance |
| • System | |
| • | Service/Maintenance Agreements |
|
|
|
Technical Training | • | Product Technology |
| • | Custom Designed Training |
|
|
|
Technical Operations | • | Detail Engineering |
| • | |
| • | Drafting Services |
|
|
|
Page 14
©1998, ADC Telecommunications, Inc.