Hardware Installation 2
Installation and Operation Guide 19
3This exposes a layer of soft insulation. Remove it to expose the hard oven
insulation. Remove the precut insulation piece at the location shown in
Figure 4.
4Replace the soft insulation. Install the valve box blanking plate, using one
screw at the front and one at the rear to secure it. See Figure 5.
Figure 4 Remove the insulation cutout
Figure 5 Install valve box blanking plate
Remove
this
cutout
Two screws