20.Assemble the flow control gauge onto the flow control mounting bracket as shown in figure 14. Secure with nylon washer and hand knob.

OFF

PLASTIC KNOB

NYLON

WASHER

FLOW

CONTROL

GAUGE

FLOW

CONTROL

ARM

FLOW CONTROL

MOUNTING BRACKET

FIGURE 14

21.Move flow control arm to off position and slide flow control mounting bracket toward hopper until clo- sure plate (located in bottom of hopper) is com- pletely closed. Tighten 1/4" hex lock nuts as- sembled in step 19. See figure 14.

22.Pre-lubricate per lubrication section on page 9 before operating spreader.