
7.For the standard setup, use the holes shown in the illustration. Other hole combinations allow different handle heights and hopper angles. Do not use holes in stand that are farthest apart as a combination - flow gate may not close completely.
Attach the stand to the hopper frame tube using two 1/4 x
See figure 4.
USE | |
MIDDLE | NUT (E) |
HOLE |
|
9.Install a handle grip on each handle. See figure 6.
10.Attach the flow control lever to the bracket using one
1/4 x 3/4 in. bolt, nylon washer and nylock nut. Tighten carefully to allow the lever to move freely. Install the vinyl grip. See figure 6.
HANDLE | ||
GRIP (P) | ||
HEX BOLT (C) | ||
|
1/4 in. NYLON WASHER (G)
LEVER
GRIP (Q)
|
|
|
USE THIS | x | |
HOLE | HEX BOLT (B) |
FIGURE 4
8.Attach the two upper handles together with the flow control bracket as shown using three 1/4 x
HEX BOLT (A)
1/4 in. WASHER (F)
NUT (E)
FIGURE 5
|
| ||
LEVER | |||
NUT (E) | |||
|
|
FIGURE 6
11.Attach the spring to the stainless steel pattern plate as shown. Attach the opposite end of the spring to the 1/8 in. hole in the flow control rod. Rotate the end of the rod into the flow control link. See figure 7.
SPRING
ANCHOR
HOLE
SPRING (L)
1/8 in. HOLE
FLOW
CONTROL
LINK
FIGURE 7