Air King AKCV1225, AKCV1380, AKCV1310 manual Installation Instructions, Planning the Installation

Models: AKCV1310 AKCV1225, AKCV1380, AKCV1310 AKCV1380

1 5
Download 5 pages 63.22 Kb
Page 2
Image 2
INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

1.Unpack central vacuum power unit from the carton and confirm that all pieces are present. In addition to the power unit you should have:

1 - Power unit mounting bracket

1 - Inlet valve

1 - Instruction/Safety Sheet

Planning the Installation

The Air King Central Vacuum System consists of three major components. The power unit, fittings including the inlet valves and tubing, and the tool kit. The power unit is designed to be permanently mounted in one location with connections made to the living area with a network of inlets and tubing.

Locating the Power Unit

1.The power unit can be located in a garage, basement, utility room, or any other room that allows for sufficient ventilation, is dry, and provides accessibility to the unit for emptying the collection canister.

CAUTION: IF THE POWER UNIT IS INSTALLED IN A CLOSET OR UTILITY ROOM, IT MUST BE VENTED TO PROVIDE ENOUGH AIR FLOW. LOUVERED DOORS CAN BE USED. DO NOT MOUNT IN A HIGH AMBIENT TEMPERATURE AREA SUCH AS ATTIC, FURNACE ROOM, ETC.

NOTE: If venting the unit to the outdoors, avoid venting to areas such as patios or entranceways.

2.The power unit should be mounted within 5 feet of an acceptable outlet. Check the electrical specifications of your specific unit to ensure the circuit is not being overloaded. A dedicated 15 amp circuit should be used.

Locating the Inlet Valves

1.The number of inlet valves will be determined by the layout of your home. The hose must be able to reach every corner of the home including inside closets and around furniture. Inlets should be placed in central locations and avoid placing behind furniture or doors.

2.Using a 30 foot piece of string or the hose itself, have one person hold one end to the planned inlet location and have the second person walk around the room(s) to determine if more inlets are needed. Continue this exercise until you can reach every area of the home (Figure 1).

Power

Bedrm

Bedrm

Bedrm

Unit

 

 

Living

 

Bath

 

Room

 

 

Hall

Garage

Kitchen

 

 

 

Figure 1

3.If the installation is for new constructions and you are working with 1/4" scale blueprints, use a seven inch string to represent the hose.

NOTE: If an electrical tool kit with a corded hose will be used, make sure an electrical outlet is located within 5 feet of the inlet.

Planning the Tubing System

1.The tubing system will include a main trunk line that will flow from the furthest wall inlet back to the power unit and can be run through the basement or the attic (Figure 2). The trunk line should be kept as straight as possible to maximize the unit performance. When elbows are needed 45° fittings should be used or if a 90° connection is required, a sweep elbow should be used.

45° Elbows

 

 

45° Wye

 

Trunk Line

Obstruction

 

 

Stop

Trunk Line to

Coupling

Branch

Power Unit

Line

 

Trunk Line to

Figure 2

last Inlet

 

2.Branch lines join the remaining inlets to the trunk line and can be run through walls, closets, cold air return duct, etc. As with the trunk line, branch lines should be kept at straight as possible.

3.Avoid gravity drops in the branch line. A branch line located directly below an overhead trunk line will accumulate dirt due to the effects of gravity. The result will be a pile of debris at the base of the inlet valve each time it is opened (Figure 3).

Correct

Wrong

Figure 3

CAUTION: MAKE SURE TUBING WILL NOT OBSTRUCT OR INTERFERE WITH ELECTRICAL, PLUMBING, OR OTHER MECHANICAL INSTALLATIONS.

Installation into New Construction

Installing the Inlet Valves

1.Using flush mounting screws (not provided) install the appropriate inlet mounting plate to the wall stud (Figure 4).

Model CVIV70

Standard Inlet

Mounting Plate

Model CVIV65

Electric Inlet

Mounting Plate

Model CVIV80

Plaster Guard

Figure 4

NOTE: Installation height will depend on personal preference, but generally the inlet is installed 18" above the finished floor.

2.To protect the system during the drywall phase of construction, an optional CVIV80 plaster guard can be utilized and should be installed at this point.

000000 Rev A. 3-05

www.airkinglimited.com

2 of 16

Page 2
Image 2
Air King AKCV1225, AKCV1380, AKCV1310 manual Installation Instructions, Planning the Installation, Locating the Power Unit