OPERATION

Another method for large dirt piles is to build a ramp approach to the pile.

It is important to keep the bucket level when approaching a bank or pile. This will help prevent gouging the work area.

6212 01/11

Operation Section 4-31

© 2011 Alamo Group Inc.

OPERATION

Page 71
Image 71
Alamo 6212 manual Operation