Alamo 6212 manual Maintenance, Lubrication Schedule

Models: 6212

1 100
Download 100 pages 37.98 Kb
Page 88
Image 88
Lubrication Schedule

MAINTENANCE

MAINTENANCE

Lubrication Schedule

Before operating your Loader, take the time to inspect and repair any damage to the machine or tractor. Only a minimum of time and effort is required to regularly maintain this machine to provide long life and trouble free operation.

Lubricate all grease fittings: one at each end of lift boom arms and one at rod and base ends of each lift and bucket cylinders.

NOTE: Fully retract bucket to a comfortable height to grease bucket/loader boom joint. Do not reach or stand under a raised loader or attachment without proper support.

6212 01/11

Maintenance Section 5-4

© 2011 Alamo Group Inc.

Page 88
Image 88
Alamo 6212 manual Maintenance, Lubrication Schedule