5.1. Main ten an ce in ter vals
Dai ly: Check war ning signs on equip ment for good
le gi bi li ty and com ple te ness.
Check the oil le vel in the oi ler.
Emp ty the wa ter se pa ra tor.
Check ope ra ting pres su re of the plant’s supp ly
net work (5-6 bar (72.52-87.02 PSI) sys tem over
pres sure).
Every three months: Check the SKW for smooth ope ra ti on.
Every six months: Check all elec tri cal and me cha ni cal con nec tions
for se cu re fit.
FIn case of soiled material and material with a high dust
content equipment should be checked monthly for smooth
operation.
046-3MS
SKW
Main ten an ce 35