Exhaust Requirements

1

2A

L

K

J

I

H

G

F E

D C

B

A

3

ONE BATTERY SAME AS LARGEST STATION USED

TMB2019N

1

2B

I

J

K

L

L

K

J

I

 

CONTINUE

 

 

 

 

 

 

CONTINUE

TO A

 

 

 

 

 

 

TO A

3

TWO BATTERIES

TMB2018N

TMB2018N

1NOTE: Where the exhaust duct pierces a combustible wall or ceiling, the opening MUST be sized per local codes.

2A Outlet Duct Diameter for One Battery

2B Outlet Duct Diameter for Two Batteries

345° Typical

Figure 11

28

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

70304601