Chapter 2: Installation

Choosing a Site for the AT-6101GP PoE Injector

Observe these guidelines when planning the installation of the

AT-6101GP

If you plan to install the power injector on a table, the table should be level and stable.

The power outlet should be located near the power injector and be easily accessible.

The site should allow for easy access to the ports on the front of the power injector, so that you can easily connect and disconnect cables, and view the port LEDs.

The site should not expose the power injector to moisture or water.

The site should be a dust-free environment.

The site should include dedicated power circuits or power conditioners to supply reliable electrical power to the network devices.

20

Page 24
Image 24
Allied Telesis manual Choosing a Site for the AT-6101GP PoE Injector