Allied Telesis AT-6101GP manual Installation Procedures, Table Top Installation Wall Installation

Models: AT-6101GP

1 34
Download 34 pages 35.75 Kb
Page 26
Image 26

Chapter 2: Installation

Installation Procedures

Table Top

Installation

Wall Installation

Depending on where you install the unit. perform the following procedures when installing the AT-6101GP PoE Injector:

”Table Top Installation” or ”Wall Installation”

“Ethernet Cable Installation” on page 23

“AC Power Cord Installation” on page 24

For installation of the AT-6101GP PoE Injector on a table top, perform the following procedure:

1.Position the AT-6101GP PoE Injector on a table top so it that conforms to the guidelines listed in “Choosing a Site for the AT-6101GP PoE Injector” on page 20.

2.Go to “Ethernet Cable Installation” on page 23 for the next step in the installation.

Installing the AT-6101GP PoE Injector on a wall requires the following items:

Two wall screws (included with the power injector)

Two wall anchors (included with the power injector)

Perform the following procedure for installation of the AT-6101GP PoE Injector on a wall:

1.Hold the AT-6101GP against the wall where it is to be installed.

The power injector should be oriented such that the AC power connector is facing up and the Ethernet connectors are facing down. Use a pencil or pen to mark the wall locations of the mounting screw holes as illustrated in Figure 5.

Figure 5. Marking the Screw Hole Locations

22

Page 26
Image 26
Allied Telesis AT-6101GP manual Installation Procedures, Table Top Installation Wall Installation