Procedure for Functional Check
of Replacement Components ________
Microprocessor Controller (Computer) Board
Upon completing installation of the replacement microprocessor controller (computer) board, reestablish power to the dryer.
Start the drying cycle by pressing any of the preset cycles in letters
Verify that the applicable indicator lights on the microprocessor controller (computer) board are lit. (Refer to the illustration below.)
For Models with DSI Module (Type I)
Theory of Operation: Start the drying cycle. When the gas burner ignites within the chosen trial for ignition time
A steady L.E.D. indicator indicates normal operation.
No L.E.D. indicator indicates a power or an internal failure has occurred.
For Models with DSI Module (Type II)
Theory of Operation: Start the drying cycle. When the gas burner ignites within the chosen trial for ignition time
An unlit red L.E.D. diagnostic indicator indicates normal operation.
A lit green L.E.D. diagnostic indicator indicates dryer controller is calling for heat and that all interlocks have been satisfied.
113335 - 12 | www.amdry.com | 25 |