1.Leveling Dryer

To level dryer, place 4-inch (10.16 cm) square metal shims (refer to the illustration on page 11) or other suitable material under the base pads. It is suggested that the dryer be tilted slightly to the rear. If more headroom is needed when moving dryer into position, the top console (module) may be removed.

a. To remove top console (module).

NOTE: DO NOT have power connected when separating the top console.

1)Disconnect the ground wire (A) at the rear of dryer.

2)Remove the six (6) sets of nuts and washers (B) holding the console (module) to base. (Located within control boxes.)

3)Open control door and control panel then disconnect the following:

a)On the right side box, disconnect the 4-pin and 2-pin plug. Also remove the air connection at the union.

b)On the left side box, disconnect the drive and blower motor wires, along with the two (2) "red" and "black" wires.

4)Lift the console (module) off of the dryer base (C).

IMPORTANT: The dryer must be transported and handled in an upright position at ALL times.

12

Page 16
Image 16
American Dryer Corp ML-96D installation manual