![Power Shutdown Procedure](/images/new-backgrounds/100511/1005119x1.webp)
Power Shutdown Procedure
The generator power supply must be shutdown prior to installing the Conversion Kit.
1.Ensure that the CTEG4M Enclosure is NOT running on generator power.
2.Disconnect the cable from the negative
3.Switch the battery circuit breaker to the OFF position.
4.Switch the utility circuit breaker to the OFF position.
Conversion Kit Installation
1.Open the generator enclosure.
2.Locate the gas solenoid valve and pull the two connectors off of the solenoid.
Front View Generator Enclosure
|
| Generator |
| Stand Off | |
|
|
|
|
| |
|
| New |
|
| Relay to be |
Power Supply and |
| Long |
|
| |
|
|
| |||
| Harness | Solenoid |
| ||
Transponder(s) |
|
| to Stand Off | ||
located in attached | Conduit | New Short | Connectors on |
|
|
enclosure. | Valve |
|
| ||
|
| Harness |
|
|
|
| Original |
|
|
|
|
| Solenoid Wires |
|
|
|
3.Replace the original wiring with the new long and short harnesses. See figure below for details.
Relay Pinout
New Long Harness
Original | New Short |
Solenoid Wires | Harness |
No Connection
3