Installation Instructions
ONE SHOWER SYSTEM | 2064.724 |
Thank you for selecting
To ensure that your installation proceeds
Certified to comply with ANSI A112.18.1
M968927 Rev . 1 . 1
Recommended Tools & Materials |
| 10mm (3/8) | |||
|
|
|
| Pencil | |
|
|
|
| Drill Bit | |
|
|
| Hammer |
|
|
|
|
|
|
| Electric Drill |
Level |
| Teflon Tape | Phillips Screwdriver |
| |
|
|
| |||
FINISHED WALL | 13mm | 32mm | |||
|
|
| |||
95mm |
|
| (1/2) |
| |
|
| 1/2" NPT |
| ||
| 76mm |
| |||
54mm |
| 41mm | (3) |
|
|
|
|
|
| ||
38mm |
|
|
|
| 53mm |
|
|
|
| ||
|
|
|
| (48" - 60") (OPTIONAL) |
|
|
|
| 620mm | TO FINISHED FLOOR |
|
|
|
|
|
| |
|
|
| 1/2" NPSM HOSE | ||
|
|
| CONNECTION | ||
|
|
|
|
| RUBBER GASKET |
|
|
|
| 60mm | FINISHED |
|
|
|
| WALL | |
|
|
|
| 65mm |
|
|
|
|
|
| |
|
| 19mm |
|
|
|
|
| (3/4) |
|
|
|
|
|
|
|
| 203mm |
|
|
|
|
| (8") |
33.5mm |
|
|
| 151mm | 59" |
|
| 96mm | (6") |
| |
|
|
| |||
OPTIONAL TO | 25mm |
| |||
| (1") |
| |||
| FINISHED FLOOR |
| |||
|
|
|
| ||
| USUALLY BETWEEN |
|
|
| |
| 915mm TO 1219mm |
|
|
| |
| (36) | (48) | FINISHED FLOOR |
|
|
|
|
| 1/2" NPSM |
|
1 |
|
| Turn off hot and cold water | 1 | |
| INSTALL WALL SUPPLY | CAUTION | |||
| supplies before beginning. |
|
| ||
|
|
|
|
|
|
Supply to WALL SUPPLY (1) is 1/2" NPT. See
Install RUBBER SEAL (2) onto WALL SUPPLY (1). |
| 1/2" NPT |
| 2 | APPLY SEALANT |
Apply sealant or teflon tape to threads of 1/2" NPT supply nipple. Thread WALL SUPPLY (1) | OR TEFLON TAPE |
onto supply nipple making a water tight seal. WALL SUPPLY (1) with RUBBER SEAL (2) should be tight against finished wall.