American Standard 2808.222, 2908.222 installation instructions Fig. A, Fig. B

Models: 2808.222 2908.222

1 4
Download 4 pages 31.28 Kb
Page 3
Image 3
Fig. A.

6 ATTACH CABLE CONNECTOR

Thread CABLE CONNECTOR (1) clockwise onto DRAIN BODY CONNECTION (2) and hand tighten. Fig. A.

Your new POP-UP DRAIN installation is now complete. Fig. B.

Note: Tailpeice on pop-up drain is 1-1/4” O.D.

Fig. B.

Fig. A.

1

2

Fig. B.

Manual background 1-1/4” O.D.

7 CHECK OPERATION OF POP-UP

Operate LIFT KNOB (1) to verify that STOPPER (2) opens and closes.

Note: If STOPPER (2) does not open and close properly then refer to the “troubleshooting section” of these instructions.

1

Manual backgroundManual background 2

8 MAKE WATER SUPPLY AND WASTE CONNECTIONS

NOTE: FLEXIBLE SUPPLIES OR BULL-NOSE RISERS NOT INCLUDED

AND MUST BE PURCHASED SEPARATELY.

Thread TEE BODY (4) to SPOUT SHANK (5).

Thread HOSE CONNECTOR (6, 6A) to VALVE CONNECTIONS (7, 7A).

Connect water supply to VALVE BODIES (1,1A) with 1/2" IPS FLEXIBLE SUPPLIES (2) or 3/8" O.D. BULL-NOSE RISERS (3). Use

adjustable wrench to tighten connections. Do not over

tighten. Be careful not to kink copper supply when bending. Use tubing cutter to cut to proper length.

Connect HOT water supply to inlet of left SHANK and COLD water supply to right SHANK using sealant, appropriate connectors, and COUPLING NUTS.

Connect 1-1/4” O.D. tailpiece on POP-UP DRAIN to

1

waste outlet.

 

7

1/2" PIPE THREAD

6

 

 

WASTE

 

OUTLET

2

 

FLEXIBLE

 

SUPPLIES

 

HOT

 

5

1A

6A

7A

 

 

COUPLING

 

NUT

3/8 O.D.

 

4 BULL-NOSE

 

RISERS

3

 

 

COMPRESSION

 

NUT

 

FERRULE

COLD

3/8 COMPRESSION CONNECTION

US60385 Rev. 1 . 2

3

Page 3
Image 3
American Standard 2808.222, 2908.222 installation instructions Fig. A, Fig. B