American Standard 3808.101 Attach Cable Connector, Fig. B, Check Operation Of Pop-Up, Approx

Models: 3808.101

1 4
Download 4 pages 44.26 Kb
Page 3
Image 3
7 ATTACH CABLE CONNECTOR

7 ATTACH CABLE CONNECTOR

Thread CABLE CONNECTOR (1) clockwise onto DRAIN BODY CONNECTION (2) and hand tighten. Fig. A.

Your new POP-UP DRAIN installation is now complete. Fig. B.

Note: Tailpeice on pop-up drain is 1-1/4” O.D.

Fig. B.

Fig. A.

1

2

Fig. B.

Fig. B. 1-1/4” O.D.

8 CHECK OPERATION OF POP-UP

Operate LIFT KNOB (1) to verify that STOPPER (2) opens and closes.

Note: If STOPPER (2) does not open and close properly then refer to the “troubleshooting section” of these instructions.

8 CHECK OPERATION OF POP-UP9 MAKE WATER SUPPLY AND WASTE CONNECTIONS1

APPROX. 20" 2

9 MAKE WATER SUPPLY AND WASTE CONNECTIONS

Connect FLEXIBLE SUPPLIES (1, 2) directly to wall supplies. Connection on fitting supplies are 3/8" compression. Connect left SUPPLY (1) to Hot (Marked with a Red Band) and right supply to COLD (2) wall supply.

Faucet supplies are 20" long from faucet base.

Note: If additional supply length is required, installer must purchase additional parts separately.

Important: If SUPPLY HOSES (1, 2) are to long, loop as illustrated to avoid kinking.

Connect 1-1/4” O.D. tailpiece on POP-UP DRAIN to

APPROX. 20"

waste outlet.

1Manual backgroundManual background RED BAND

2

BLUE

BAND

3/8" COMPRESSION

Manual backgroundHOTManual background COLD

51314 Rev . 1 . 3

3

Page 3
Image 3
American Standard 3808.101 installation instructions Attach Cable Connector, Fig. B, Check Operation Of Pop-Up, Approx