Installation
Instructions
GREEN TEA | 7010.900 |
| 7010.901 |
Thank you for selecting
To ensure that your installation proceeds
Certified to comply with ANSI A112.18.1M
M968595 Rev . 1 . 2
Recommended Tools |
Flat Blade Screwdriver
ADJ.
*Wrench
Adjustable Wrench
Channel Locks
*Hex key *Supplied with Fitting
MOUNTING
SURFACE
3" | |
|
(H) | |
N.P.T. INLETS |
|
(200mm)
| ||
| DIA. | |
| DIA. | |
|
| |
| ||
MAX. |
| |
3 |
| |
|
|
12 MAX
1 SPOUT ASSEMBLY
CAUTION | Turn off hot and cold water |
supplies before beginning. |
Install RING WASHER (1) into SPOUT recess. Check that
Assemble RUBBER WASHER (4) and BRASS WASHER (5) and LOCKNUT (6) onto SPOUT SHANK (3). Align SPOUT ASSEMBLY and from underside of ledge secure SPOUT ASSEMBLY into position with LOCKNUT (6).
SPOUT
ASSEMBLY
SPOUT RECESS
1
3 2
MOUNTING
SURFACE
4
5
6
2 PREPARE TUBE AND TEE ASSEMBLY
Prepare TUBE and TEE ASSEMBLY (1) to fit center to center VALVE (2) location (between
Remove COUPLING NUT (3) and FERRULE (4) from each VALVE (2) and slide onto TUBING (5).
4
3
1
5
3
4
ADJ.
MOUNTING
SURFACE
2
NOTE VALVE inlet is