American Standard 7271.021, 7271.521, 7271.400 Air, Gas, Vacuum, Water, Important service note, M

Models: 7271.571 7271.300 7271.071 7271.021 7271.301 7271.400 7271.521

1 4
Download 4 pages 32.48 Kb
Page 3
Image 3
(AIR, GAS, VACUUM, WATER)

1

INSTALL FRONT-LOADED ANGLE CONTROL VALVE, 7271.021/521

(AIR, GAS, VACUUM, WATER)

Important service note:

The Faucet Panel mounted fume hood fitting has been designed such that future servicing of the fitting's cartridge can be done from the (user's) side of the fume hood. To do this, insure that the main supply valve to the fitting has been completely turned off and then purged by completely opening the fitting and releasing trapped material into the fume hood atmosphere. Then, support the entire fitting by holding the hold-down nut in place with a wrench, before loosening the cartridge's cap nut.

This Panel mounted fume hood valve has been shipped as shown below to ease installation. It is designed to be installed in a 45 angled fume hood equipped with 1-1/2" (38.1mm) diameter mounting holes. Before proceeding with the installation, identify and familiarize yourself with all of the components.

Important Note: The front load fume hood fittings described in these installation instructions are available in both right hand and left hand models. Right hand models are marked on both sides of the body with an "R" and left hand models are similar marked with an "L". Due to the use of these fittings in both right and left hand fume hoods, the bodies are marked on both sides with directional flow arrows. Regardless of the model used, the fittings are designed to be installed such that the inlet is on the bottom.

45˚ ANGLED FUME HOOD

FIGURE 1

BODY

SHOULDER

WASHER

IMPORTANT: FLUSH ALL SUPPLY LINES PRIOR TO FITTING INSTALLATION.

1-1/2" (38.1mm)

MOUNTING HOLE

Remove the hold-down nut from the body and the handle screw from the stem. With a pair of

 

body such that the threads on the two components lock together.

 

HOLD DOWN NUT

 

 

Place the front end of the body (end which contains the operating cartridge) through the 1-1/2"

45˚ ANGLED

 

 

hold-down nut

onto the body

 

 

FUME HOOD

hold-down nut at this time.

 

 

 

Align the mounted fitting from the backside of the fume hood such that the body's inlet and outlet

 

are in line and the

 

 

 

support the valve body from the backside, tighten the hold-down nut securely.

 

 

 

handle onto the stem and tighten it

 

into place with the screw removed from the stem.

index button

 

into handle

 

STEM

 

 

 

 

Complete the inlet and outlet piping to the fitting and check for leaks.

HANDLE

 

 

BODY

 

 

HANDLE

SHOULDER WASHER

INDEX BUTTONS

 

SCREW

 

 

HOLD DOWN NUT

(AIR, GAS, VACUUM, WATER)

 

CARTRIDGE STEM

 

FIGURE 2

2

INSTALL FRONT-LOADED VALVE FOR STRAIGHT PANELS, 7271.071/571

 

(AIR, GAS, VACUUM, WATER)

 

IMPORTANT: FLUSH ALL SUPPLY LINES PRIOR TO FITTING INSTALLATION.

 

 

 

Remove

and flange from valve.

 

 

 

 

 

 

Rubber seal washer, steel washer and lock nut

valve

 

 

 

Align the mounted

valve and

 

 

 

 

 

 

are in line and the

 

VALVE

 

valve body

securely.

 

 

 

 

LOCK NUT Important service note:

STEEL WASHER Manual background RUBBER WASHER Manual background

With valve now firmly secured to the fume hood install the cap nut Manual background cross handle

and secure with handle screw.index button into handle counter bore.

Complete the inlet and outlet piping to the valve and check for leaks.

CAP NUT

Manual background PACKING NUT (7271.571 and 7271.521 ONLY)

Manual background HANDLE SCREW

HOOD MOUNTING HOLE Manual background

NDEX BUTTON

FLANGE Manual background

CROSS HANDLE Manual background

M 9 6 8 4 8 4

Page 3
Image 3
American Standard 7271.021, 7271.521, 7271.400, 7271.301, 7271.071 Air, Gas, Vacuum, Water, Important service note, M