VANITY INSTALLATION
Unpack unit carefully, taking care that bottom shelf does not drop and damage front legs (see Figure 2).
Provide suitable reinforcement for anchoring the vanity to the wall. Centerline of reinforcement should be 31" up from the floor (see Figure 1).
Rough in supply lines and waste per
The molding needs to be notched to seat the vanity flush against the wall.
Move the vanity into place and level with the adjustable glides on the bottom of the feet.
The glides can be adjusted outward up to 1" but it is recommended not to exceed 1/2" if possible.
Drill at least two 3/8" O.D. anchoring holes through the centerline of the rear stringer of the vessel stand, located 1" down from the top of the table (see Figure 2).
Anchor the vanity to the wall through at least 2 of the anchoring holes in the rear of the vanity (see Figure 2).
Continue with installation appropriate for top and sink options chosen.
FIGURE 1 |
|
|
|
C/L of 2 x 6 |
|
|
|
Reinforcement |
|
|
|
31" |
|
|
|
(787mm) |
|
|
|
Finished |
|
|
|
Floor |
|
|
|
FIGURE 2 |
|
|
|
|
|
| |
(546mm) |
| REAR STRINGER WITH |
|
|
|
| |
|
| ANCHORING HOLES TO |
|
|
| SECURE VANITY TO WALL |
|
|
| 3" | ANCHORING HOLES |
|
| IN REAR STRINGER | |
|
| (76mm) | |
|
| [NOT SHOWN] | |
|
|
| |
|
|
| |
(850mm) |
|
|
|
ADJUSTABLE |
|
|
|
LEVELLERS |
|
|
|
(under each |
|
|
|
foot) |
|
|
|
- | 2 | - | |
|