UNDER DECK MOUNTING INSTRUCTIONS
Please note that care must be taken to protect the surface of the tub during all aspects of the installation. Do not drill or cut the bath deck with the tub directly beneath it as damage to the tub may result.
1.Install the tub per the installation instructions provided with the unit.
2.Prepare the bath deck support structure per the local codes. Note - the bath deck must be self supporting.
3.Cut bath deck to your specifications.
4.Place the bath deck in position and trace the opening on the tub with a soft pencil. Do not drill or cut the bath deck with the tub directly beneath it as damage to the tub may result.
5.Remove the bath deck and apply a generous bead of waterproof sealant on the outer edge of the traced line.
6.Replace the bath deck and secure it into place.
7.Apply additional sealant along the tub and bath deck interface as necessary to ensure a watertight seal.
8.Remove excess sealant per the manufacturer's instructions.
Finished bath deck surface material must be
Waterproof
Sealant
Bathtub
Bath deck support material
Tub support structure per installation instructions provided with the tub
DRAIN CONNECTION AND
SYSTEM TEST
(before installing bath into
framed out structure)
With supplied cable drain assembled to bath, connect drain outlet to waste line in accordance with the drain assembly instructions. Tighten all drain joints securely. Check the couplings and make sure they are
OVERFLOW ASSEMBLY
VERTICAL
DRAIN PIPE
AIR BATH DRAIN ILLUSTRATION
DRAIN STOPPER
WITH
ADJUSTABLE
BOLT
METAL STRAINER
BOLT
METAL
STRAINER
|
| FLAT RUBBER |
CLOSE | OPEN | GASKET |
|
DRAIN WASTE
FLANGE
PLASTIC DRAIN BASE
WEDGE OVERFLOW
GASKET ESCUTCHEON
OVERFLOW
ASSEMBLY SET SCREW
DRAIN ACTUATOR SHAFT | OVERFLOW |
| RETAINER |
OVERFLOW NUT WITH |
|
| AIR BATH NUT |
| WITH WASHER |
| AND GASKET |
90˚ ELBOW | HORIZONTAL | PLASTIC | |
DRAIN BASE | |||
| DRAIN PIPE | ||
|
|
16 |