AMERI*CAN TELECOM INC.
Technical Document
Charger Installation
The SL PTG012 SpectraLink Phone and Charging station is shipped with its power supply and charger regulator boards installed, and with their distribution jacks routed and configured, as illustrated here:
SL PTG012, Rear View
At the front of the unit:
1.Lift open the front door of the enclosure.
2.Locate the
Door
Charger
Power
Supply
Jacks
Charger Mounting Hole-pairs
SL PTG012 Installation Instructions | Page 2 |