Anchor Hocking Glass NAV40GBL-1104 installation instructions Cabled Bays

Models: NAV40GBL-1104

1 16
Download 16 pages 7.13 Kb
Page 12
Image 12

COMPLETING THE TOP FRAME

INSTALLING GABLED END FRAME

REPEAT PREVIOUS STEPS UNTIL ALL BEAMS ARE VERTICAL AND BOTH END BAYS ARE X-CABLED, AS SHOWN.

UG-15

3

EW-15

1

4

5

EE-10

2

6

7

BFW

8

9

10

T-30

11-T-a

INSTALL GABLED END FRAME. MAKE CONNECTIONS IN THE ORDER SHOWN.

INSTALLING GUY WEBS BEFORE INSTALLING FABRIC

STAKING DISCLAIMER: DUE TO VARYING SOIL CONDITIONS AT EACH INSTALLATION SITE, THE STAKES PROVIDED MAY NOT MEET THE LOADING REQUIREMENT SHOWN ON THE BLUEPRINT AND ENGINEERING ANALYSIS. IT IS THE INSTALLERS RESPON- SIBILITY TO VERIFY THE SOIL CONDITIONS AND PROPER ANCHORING DEVICES REQUIRED AT EACH SITE TO ENSURE A SAFE INSTALLATION.

ATTACH GUY WEBS TO EAVE WELDMENTS AND STAKE OUT

AT A 45 DEGREE ANGLE (DISTANCE OUT = HEIGHT OF UPRIGHT, USUALLY 8 FT. USE 42” STAKES PROVIDED.

X-CABLED BAYS

NAVI-TRAC UNITS 100 FT OR MORE IN LENGTH MUST HAVE AN X-CABLED BAY (NEAR THE MID- DLE AND/OR EVENLY SPACED) FOR EVERY 100 FT OF LENGTH.

STAKE PLATES AT PROPER SPACING BEFORE INSTALLING THE X-CABLES. THEN, ADJUST TURNBUCKLES UNTIL CABLE IS SNUG

X-CABLING FROM EAVE TO BASEPLATE (AS

SHOWN) ON BOTH SIDES OF THE STRUCTURE.

SUBSTITUTE BOLTS FOR PINS AT THE TOP OF BOTH UPRIGHTS. THREADS SHOULD POINT INWARD TOWARD EACH OTHER. THREAD CABLE EYENUTS ONTO EACH BOLT TO SECURE THE CABLE.

REMOVE THE NUTS FROM THE BOLTS THAT PIN THE BASEPLATE TO THE UPRIGHT. TURN THE BOLTS SO THAT THE THREADS ARE TO THE INSIDE (FACING EACH OTHER). THREAD THE CABLE EYENUTS ONTO THE BOLTS TO SECURE THE CABLE.

12

Page 12
Image 12
Anchor Hocking Glass NAV40GBL-1104 Cabled Bays, Completing the TOP Frame Installing Gabled END Frame