AOC LM914 user manual Installation Instructions, Swivel Base, Powercord, Power Source

Models: LM914

1 26
Download 26 pages 34.26 Kb
Page 6
Image 6

LM914

INSTALLATION INSTRUCTIONS

SWIVEL BASE

Install

Remove

Figure 1 Installing and Removing the Swivel Base

POWERCORD

Power Source:

1.Make sure that the power cord is the correct type required in your area.

2.This LCD monitor has an External universal power supply that allows operation in either 100/120V AC or 220/240V AC voltage area (No user adjustment is required.)

3.Connect the AC-power cord into your LCD monitor’s External Adapter input socket, and then plug the other end of External adapter to LCD monitor’s DC-power-input. The AC-power cord may be connected to either a wall power outlet or the power outlet socket on your PC, depending on the type of power cord supplied with your LCD monitor.

NOTES

A certified power supply cord has to be used with this equipment. The relevant national installation and/or equipment regulations shall be considered. A certified power supply cord not lighter than ordinary polyvinyl chloride flexible cord according to IEC 60227 (designation H05VV-F 3G 0.75mm! or H05VVH2-F2 3G 0.75mm! ) shall be used. Alternative a flexible cord be of synthetic rubber according to IEC 60245 (designation H05RR-F 3G 0.75mm! ) shall be used.

5

Page 6
Image 6
AOC LM914 user manual Installation Instructions, Swivel Base, Powercord, Power Source