5
Ground Mount Installation
1. Install an APC approved concrete pad. Contact your dealer or refer to the APC Web site,
www.apc.com for more information.
2. Secure the enclosure to the pad. Refer to the diagrams below.
0 Battery Enclosure:
Attach the ground skirt to the concrete pad.
Attach the enclosure to the ground skirt.
3 Battery, 6 Battery Enclosures:
Place the enclosure on the pad. The holes on the
enclosure must be aligned with the anchor hooks
on the pad, (hardware not included).
This is a general representation of an enclosure
mounted on a pad. Configurations may vary.
Service Entrance/
Load Cente
r
Coax Housing
Meter Base
Coax Housing