PreparationforOperation
SeveralitemsmustbeconsideredwhenpreparingtheMGEGalaxy4000UPSsystemforoperation.
1.TheUPScabinetanditsauxiliarycabinetsmustbearrangedintherequiredcongurationto
insurethattheinterconnectioncablesarelocatedinthecorrectadjacentcabinets.
2.Thecabinetsmustbeinalocationthatprovidesforproperairowandheatrejection.
3.TheroominwhichtheMGEGalaxy4000UPSsystemislocatedmustmaintainenvironmental
conditionswithinrecommendedtolerances.
4.Allelectricalconnectionsmustutilizethetoporbottomconduitentriesprovided.
Thefollowingsectionsdiscusstheseitemsinmoredetail.
CabinetPlacement
ThecompleteUPSsystemmayconsistofonetothreecabinetsdependingontheoptionsselected.The
UPScabinetallowssystemoptionstobeselectedbasedontheapplication.WhenfacingtheMGE
Galaxy4000UPSfromthefront,thestandardarrangementprovidesforanyexternalbatteriestobe
locatedontherighthandside,andthedistributioncabinettobelocatedonthelefthandsideoftheUPS.
AAirexhaustFExternalbatterycabinet(optional)
BDisplaypanelGUPScabinet
MGEGalaxy4000
CAllow36”topclearanceforfanexhaustand
servicemaintenance
HFrontview
DLevelingjacksIDistributioncabinet(optional)
ECastersJAirintake
6MGEGalaxy400040–75kVA208V990–3964–001