Symmetra® LX

Start-Up Guide

Extended Run Cabinets

For use with Symmetra LX UPS models:

200V, 4–8 kVA

200V, 4–16 kVA

208/240V, 4–8 kVA

208/240V, 4–16 kVA

220/230/240V, 4–8 kVA

220/230/240V, 4–16 kVA

READ FIRST

Important Safety and Installation Instructions

This guide is applicable for the Symmetra LX tower and rack-mount extended run cabinet models. These units provide extended run time for the Symmetra LX tower or rack-mount UPS models.

See and retain the product documentation shipped with your system for other important installation, operation, and maintenance instructions.

Illustrations are representative. The Symmetra LX configuration, including components and optional APC equipment, may be different from the models shown in this guide.

Entire contents copyright 2005 by American Power Conversion Corporation. All rights reserved. Reproduction in whole or in part without permission is prohibited.

APC, the APC logo, InfraStruXure, PowerChute, Smart-UPS and Symmetra are registered trademarks of American Power Conversion Corporation. All other trademarks are the property of their respective owners.

9-Battery Rack-mount Extended Run

3-Battery Rack-mount Extended Run

9-Battery Tower Extended Run

990-1873-001 04/2005

Overview

1. Read Safety and General Information Instructions

Read, understand and follow ALL safety instructions contained in the Symmetra LX Safety

 

Instructions and General Information Guide.

Electrical

Failure to follow safety instructions and warnings

Hazard

could result in equipment damage, serious injury,

 

or death.

2. Refer to the UPS Documentation

If installing the Symmetra LX and the Extended Run Cabinet(s), install according to the instructions in the Symmetra LX Start-Up Guide shipped with the UPS.

3. Install the Extended Run Cabinet(s)

Perform the physical installation for the extended run cabinet(s). See the included Symmetra LX Physical Installation Guide.

4. Follow the proceeding Start-Up Instructions

See these instructions once the physical installation for the Extended Run Cabinet(s) is complete. This section contains information on how to connect, test, and start the unit.

Start-Up Instructions

The illustrations shown in this section are applicable for the tower and rack-mount extended run cabinets.

Note

1.Connect the first Extended Run Cabinet

1.1Remove the screw and battery connector cover from the back of the UPS.

1.2Connect the power cable of the first extended run cabinet to the UPS battery connector .

1.3Set the dial of the extended run cabinet to ‘2’.

If connecting to a UPS with integrated extended run, set the dial of the first extended run cabinet to ‘3’ instead of ‘2’.

Note

1.4Connect the communications cable from the extended run communications connector on the UPS to the connector on the extended run cabinet .

Page 1
Image 1
APC 48 kVA, 240V installation instructions Important Safety and Installation Instructions, Overview, Start-Up Instructions