INSTALLATION INSTRUCTIONS (continued)
Figure 6 – Wiring Diagram
MAIN POWER SWITCH (NOT PROVIDED)
TERMINAL
BLOCK
JUMPER | GROUND | |
|
| |
|
|
|
L1 N L2
RED
FOR 120V INSTALLATION, CONNECT POWER TO L1 AND N WITH
FOR 208 OR 240 VOLT
INSTALLATIONS,
REMOVE
AND CONNECT POWER TO L1, N, AND L2
RED |
|
|
|
| BLK |
6 |
|
|
| 8 |
|
|
|
| |||
POWER RELAY CONTACTS | BLK | ||||
2 |
|
|
| 4 | |
|
|
| |||
|
|
|
| ||
|
|
|
AUTOMATIC DIGITAL HUMIDITY CONTROL (PROVIDED)
FAN PACK (OPTIONAL)
| BLK |
| 120V AC |
| WHT | |
|
|
|
|
| TRANSFORMER | |
YEL/WHT |
|
|
| 75VA | YELL | |
|
|
| 24V AC |
|
| |
CONTROL PCB CURRENT SENSING PCB |
| |||||
BLU |
|
|
|
| ||
WHT | +24V DC |
|
|
| ||
|
|
|
| |||
BLU |
|
|
|
| ||
WHT | +24V DC |
|
|
| ||
|
|
|
| |||
|
| BLK | J2 |
|
| |
|
|
|
|
|
| |
|
|
|
| J4 | HIGH LEVEL PROBE | |
|
| HUMIDISTAT |
|
|
| |
|
|
|
|
| ||
|
|
|
|
|
| |
|
|
|
|
|
| |
+24V AC |
|
|
|
|
| |
| FAN |
|
|
|
| |
COM |
|
|
|
|
| |
|
|
|
|
| ||
|
|
|
|
|
| |
|
|
|
| POWER RELAY COIL |
| |
BRN | J7 | 24V AC |
|
|
|
|
|
| 1 | 0 |
| ||
|
|
|
|
| ||
BRN | J8 | COM |
|
|
|
|
|
|
|
|
| ||
YEL | 24V AC |
|
|
|
| |
|
|
|
|
| ||
|
| COM |
| FILL VALVE |
| |
YEL |
|
|
|
| ||
|
|
|
|
| ||
BLK | J4 | 24V AC |
|
|
|
|
|
|
|
|
| ||
|
| COM |
| DRAIN VALVE |
| |
BLK | J3 |
|
|
|
| |
|
|
|
|
| ||
YEL/WHT | J2 | 24V AC |
|
|
|
|
|
|
|
|
| ||
|
| COM |
| SAFETY SWITCH |
| |
ORG | J5 |
|
|
| YEL | |
|
|
|
|
| ||
|
|
|
|
|
| |
|
|
|
| RIBBON CABLE |
| |
|
|
|
|
|
|
YEL
WATER LEVEL
PROBE
ELECTRODE ELECTRODE
STEAM CYLINDER
HIGH VOLTAGE WIRING
CONTROL CIRCUIT WIRING
DISPLAY PANEL | FIELD WIRING | ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
STATIC
DISCHARGE
GROUND
10