11
30SB, 36SB, 45SB
Snow BEAST
Snow BEAST Snow Blower
V8.10.25.12
Step 4: Chute Direction Control Cable Support
With the rubber lined one hole strap removed, put
the chute direction control cable and the chute
deflector cable into the opening, and press the
strap together aligning the hole for the bolt.
Secure strap to side of the engine.
NOTE: Rotate discharge chute and ensure there is
no binding of any cables and there is enough slack
in the deflector cable for full rotation.
Need Help With Assembly?
(919)-550-3221
Step 5: Drift Cutters (if desired)
1. The drift cutters are attached to the main housing in
the stored position.
2. Remove the two bolts on each drift cutter.
3. Reattach the drift cutters in the operating position.
4. Replace bolts and secure tightly.
Step 6: Skid Shoes
1. Skid shoes are stored in the hardware bag for shipping.
2. Remove from hardware bag, and install skid shoes using the
provided fasteners
3. Insert the fasteners so the flat head of the carriage bolt is
toward the inside of the main housing.
CAUTION: Check the skids to ensure that the auger does
not contact the paved or gravel surface. Adjust skids as
necessary to make up for wear on the snow blower.
1. Check the tire pressure to ensure the tires are properly
inflated.
2. Move skid shoes up and down to the desired position based
on the surface texture.
 If the surface is rougher adjust the skid shoes lower which
increases the auger ground clearance.
 If the surfaces is smoother adjust the skid shoes higher
(decrease ground clearance). Firmly tighten the nuts that
secure both skids to the auger sides.