![THEORYOFOPERATION](/images/new-backgrounds/46423/464233x1.webp)
THEORYOFOPERATION
Thisunitis a lightweight,portableaircleaner ernployingtwothermallyprotected,high performance,flowthrcughvacuummolors
producingveryhighvelocityarrflowthroughtheunit
'By(2 %")inletplusa varietyof utilizinga large
collectrngnozzlesandfittingsflnesolidpadiculate maierial;ndsmokemaYbe removedfromtheair by
thefiltermedia.
An initialsparktrapcollectslargepartiolesbefore thevreachthefilter. An easyto emPtytrayis attacheclto thefrontcoverto enabletheremovalof lhe larqegarticlescollectedbythesparktrapwithout removingthefilter.Thistap furtherisolatesthefilter fromsparksinthecaseof a weld,ngoperatlon.
A"cloooed"fllterliqht.actuatedby a d ferential oress;;
GENERALMAINTENANCE ONLYQUALIFIEDSERVICETECHNICIANS SHOULDMAKEREPAIRSTOTHISUNIT'
DONOTREPLACETHESEMOTORSWITH MOTORSOTHERTHANTHOSERECOMMENDED
BYTHEMANUFACTURER,
UNPACKING
Carefullyinspectthe unitforconcealeddamagethat mavhaveoccunedduringshippingandhandling lf ani damageis found,immediatelycontactthe Fr;iohtcomoanv.Makesurethereareno dentsin theiousing,as theymightpreventthefilterfrom slidingintotheunitsmoolhly lf thereis noevidence of da;aqe, removetheendcoverbyreleasingthe tworubGr latches.Removalof thefrontcoverwill allowinspectionof theinsideof theunit
Afterunpackingthemachine,checkto seethatthe followingpartsandaccessoriesarepresenl:
1)- 10'FlexibleHose
1)- Coupling
1i - Flexibbtetal Hose/MagneticBasecomPonent Parts.(SeeFiglre#2 ForIndividualParts Included)
1)- SlotNozzle
1)- Filter
INSTALLATION(SeeFisure#1)
1.lnsertthefilter,gasketfrrst,intotheunit. Then Dlacetherubberthensteelwashersoverthe threadedrod.Tightenthewingnutdownsothat thefilteris sealedandwillnotrotate.
2.Reolacethefrontcover/sparktrapassemblyand
3.Connecttheunitto thepowersourceandtest theoperationof theunitbyturningit ONwiththe On/Offswitch.Shouldthemotorsnotstart,or shouldthemachinemakeunusualnoises'
immediatelvturnthemachineoff andseek personnelOnce.thetestis
trainedmaintenance complete,turntheunitbackOFF
4.Attachthe hoseto the inlet
5.Assembletheflexiblemetalhoseandnozzleper
Figure#2.
6Connectthehose/nozzlecomolnatlon assembledin Step5 aboveto themachinewith the10'flexiblehoseandthesuppliedcoupling
ThiscomDletesthebasicassemblyofthe unit Deoendinqupontheaccessoriesorderedandthe looisticaoithe wo* place,lhe installation