5. INSTALLATION OF THE MACHINE
The machine should be located at least 40 cm in front of the back wall. The machine is equipped with a burr collection bag connector and power supply socket on the back side.
5.1. PREPARATION
5.1.1.The outer dimensions of the machine are stipulated in the Dimensions page (Page 6). The ground, where the machine will be placed, should be even, solid enough to bear the weight of the machine.
5.1.2.At the miter saws PEGASUS - SKAT all parts are delivered by the manufacturer ready for use.
5.1.3.If you have purchased a conveyor, which is offered an option, connect to either side of the machine as shown in Illustration 1.
5.1.4.Before starting the machine, remove the transport safety part as shown in Illustration
2.
Head Fixing | |
| |
| Plate |
|
|
13