Elite Pro System EPS-168T General Information
Recommended Additional Installation Materials
• Power Drill | • Tape measure |
• Carpenters Level | • Small ladder (depending on ceiling height) |
• Nail Set | • Hammer |
• Pencil | • 32 2.5” 4D finish nails |
• Straight Edge | • |
B22 ProPanel Installation Guide
➊Mark intended location of each B22 ProPanel on the wall or ceiling.
➌Start the B22 ProPanel 5/8” above its intended final height and press downward at a 45° angle until the panel is flush with the wall surface.
➋Install four impaling clips within marked B22 ProPanel location using drywall screws. Exact placement of each clip is not necessary.
Marked panel outline
TIP
For permanent mounting, apply Tubetak Pro adhesive to the back of the B22 ProPanel before completing Step 3.
CAUTION
Always use Tubetak Pro on the back of the panel when attaching it to the ceiling.