10

!CAUTION

Prior to performing any further assembly, PERFORM “FIRST TIME USE” LEAK TEST as detailed on pages 17-18.

If the grill is fully assembled before performing the First Time Use leak test, the side tables will need to be removed in order to perform the leak test on the main burner valves inside the control panel, behind the knobs, .

Step 10

Side Table Assembly

A. Screw two 1/4-20 x .50” Bolts into the two bottom threaded inserts on the outside of the Bowl. Do not screw Bolts all the way. Leave 1/8” of each Bolt exposed.

Align the bottom two holes (“keyhole slots” in detail) on the inner side of the LEFT Side Table with the two bolts thread- ed partly into the inserts in the Side of the Bowl then slide the Side Burner Table over the Bolts.

B. Holding the Side Burner Table in place, install two 1/4-20 x .50” Bolts from the inside of the Bowl into the two top threaded holes in the Side Table.

C. From under the Side Table, install one 5/32 x .31” bolt through the Side Table end into the side of the Bowl. Repeat this assembly for the RIGHT Side Table. Tighten all bolts.

1/4-20 x .50” Bolt set

8 pc

5/32 x .31” Bolt set

2 pc

A

Keyhole Slots

B

C

5/32 x .31” Bolt

Page 10
Image 10
Aussie 6804T8UK91 manual Step Side Table Assembly