
15. iQ Network
Point to point configuration
A
B
Image15-4
Incase of a temporaryconfig uration (demo purposes) one can use the point to point configuration, the con-
nection being done via RJ45 connections using a crossed UTP cable.
15.4.2 Installing the software
AnAdministrato r password has been installed for security reasons (worm and virus protection):
Password : Barco (case sensitive !)
Necessary parts
• installation CD (delivered)
•PC
How to install the client software ?
1. Install the client software from the CD ( Setup file )
How to install the server software ?
1. The server software is by default installed on the projector.
if necessary,reinstall it from the C D.
TheCD co ntaining the server software and the client tools are delivered with the projector. They can always
bedownloade dfrom thesecured PartnerZone Web site : https://secure.barco.com/presentation/
15.4.3 Start up of the BarcoIQ Server
Starting up
There are 2 methods to start up the BarcoIQ Server
• Manual start up (viathe General me nu)
• Automatic startup at projector startup: this is done by defining the state of the BarcoIQ Server during a “Projector ON state”
and a “Projector standby state” .
Manual start up: How to start up/shut down/reset the BarcoIQ Server ?
1. Press MENU to activate the Toolbar
2. Press →to select General
3. Press ↓to Pull down the General menu
4. Use ↑or ↓to select iQ Pro Server
5. Press →to open the menu
6. Use ↑or ↓to select ON/OFF/Reset (image 15-5)
7. Press ENTER
R5976694 IQ PRO R500 01/02/2007 135