2. Check up the D-Cine Premiere DP100

2. CHECK UP THE D-CINE PREMIERE DP100
Which parts have to be checked before startingup!
All covers in place and access doors closed
Power connection to wall outlet
Pressure in the cooling system of the DMD’s.
Exhaust on dirt

2.1 Covers and Access Doors

Safety considerations
In order to ensure that correct internal airflow is maintained, and that the projector complies with Electro-Magnetic Compatibility
requirements, it should always be operated with all of it’scovers in place.
Neveroperate the projector with the cover removed, the arc lam p power supply has a 35kV strike pulse mechanism, which is active
during lamp switch-on.
C
E
B
D
F
A
Image2-1
A Top cover projector head
B Rear cover projector head
C Side cover right projector head
D Front cover projector head
E Side cover projector pedestal
F Front cover projector pedestal
H
I
G
J
K
Image2-2
G Side cover left projector head
H Access door lamp unit
I Access door lamp power supply
J Rearcover pro jectorpedestal
K Side cover left projector pedestal
R5976907 D-CINEPREMIERE DP100 02/11/2005 5