2. Check up the D-Cine Premiere DP100
2. CHECK UP THE D-CINE PREMIERE DP100Which parts have to be checked before startingup!
• All covers in place and access doors closed
• Power connection to wall outlet
• Pressure in the cooling system of the DMD’s.
• Exhaust on dirt
2.1 Covers and Access Doors
Safety considerations
In order to ensure that correct internal airflow is maintained, and that the projector complies with Electro-Magnetic Compatibility
requirements, it should always be operated with all of it’scovers in place.
Neveroperate the projector with the cover removed, the arc lam p power supply has a 35kV strike pulse mechanism, which is active
during lamp switch-on.
C
E
B
D
F
A
Image2-1
A Top cover projector head
B Rear cover projector head
C Side cover right projector head
D Front cover projector head
E Side cover projector pedestal
F Front cover projector pedestal
H
I
G
J
K
Image2-2
G Side cover left projector head
H Access door lamp unit
I Access door lamp power supply
J Rearcover pro jectorpedestal
K Side cover left projector pedestal
R5976907 D-CINEPREMIERE DP100 02/11/2005 5