4.Routing the Cables
a.RGBHV cable preparation: With the help of PVC tape arrange the connectors in series. Pass the Signal cables and Power cord into cable guide R826761
.
b.Pass the Signal cables into the IQ bar assembly from top side. Take out the BNC connector (in case of a 5 BNC cable) one by one from bottom side.