FIGURE 5
WALL MOUNTING INSTRUCTIONS
SEE FIGURE 3 – MOUNTING INSTRUCTIONS
SUPPLY AIR | SUPPLY AIR |
OPENING | OPENING |
RETURN AIR | RETURN AIR |
OPENING | OPENING |
WALL STRUCTURE
FACTORY SUPPLIED RAIN
FLASHING.MOUNT ON UNIT
BEFORE INSTALLATION
SUPPLY AIR
OPENING
RETURN AIR
OPENING
BOTTOM MOUNTING
BRACKET. MOUNT ON WALL
BEFORE INSTALLING UNIT.
FIGURE 6
WALL MOUNTING INSTRUCTIONS
ATTACH TO TOP
PLATE OF WALL
1.000” CLEARANCE ALL AROUND
INTERIOR FINISHED WALL
OVER FRAME
1.000” CLEARANCE ALL AROUND
EXTERIOR FINISHED WALL
OVER FRAME
| FRAMING MATERIAL | ATTACH TO BOTTOM |
| PLATE OF WALL | |
| 2 X 4’S, 2 X 6’S AND/OR | |
|
| |
STRUCTURAL STEEL |
|
SEE UNIT DIMENSIONS, FIGURE 1, FOR ACTUAL DIMENSIONS
SUPPLY DUCT |
OPENING |
RETURN DUCT |
OPENING |
THIS STRUCTURAL MEMBER LOCATED TO MATCH STUD SPACING FOR REST OF WALL. A SECOND MEMBER MAY BE REQUIRED FOR SOME WALLS.
Manual