Bard WA421 Phase Monitor, Pressure Service Ports, Typical Settings for Dual Unit Installation

Models: WA482 WA421

1 21
Download 21 pages 59.56 Kb
Page 18
Image 18
Typical Settings for Dual Unit Installation:

Typical Settings for Dual Unit Installation:

Unit 1: DOB set at 2 minutes, and DOM is 132 seconds

Unit 2: DOB set at 4 minutes, and DOM is 144 seconds

PHASE MONITOR

All units with three phase scroll compressors are equipped with a 3 phase line monitor to prevent compressor damage due to phase reversal.

The phase monitor in this unit is equipped with two LEDs. If the Y signal is present at the phase monitor and phases are correct the green LED will light.

If phases are reversed, the red fault LED will be lit and compressor operation is inhibited.

If a fault condition occurs, reverse two of the supply leads to the unit. Do not reverse any of the unit factory wires as damage may occur.

PRESSURE SERVICE PORTS

High and low pressure service ports are installed on all units so that the system operating pressures can be observed. A pressure table can be found later in the manual covering all models. It is imperative to match the correct pressure table to the unit by model number.

Manual 2100-218 Page 16

Page 18
Image 18
Bard WA421, WA482 Phase Monitor, Pressure Service Ports, Typical Settings for Dual Unit Installation