CORGI

Registered

Gas Installer

 

CARD SERIAL NO. 999999999

00000

NAME:

 

A.N.Installer

 

 

COMPANY:

 

Newtown Heating

 

EXPIRES: 31 DECEMBER 2010

 

To confirm validity of this card please contact

 

CORGI on 0870 401 2300

 

www.corgi-group.com

 

 

Fig. 3

CORGIRegistration Card

5.0Legislation

5.1Installation, Commissioning, Service & Repair

1.This appliance must be installed in accordance with the manufacturer’s instructions and the regulations in force. Read the instructions fully before installing or using the appliance.

2.In GB, this must be carried out by a competent person as stated in the Gas Safety (Installation & Use) Regulations.

3.Definition of competence: A person who works for a CORGI registered company and holding current certificates in the relevant ACS modules, is deemed competent.

4.In IE (Eire), this must be carried out by a competent person as stated in I.S. 813 “Domestic Gas Installations”.

Lifting - This product should be lifted and handled by two people. Stooping should be avoided and protective equipment worn where necessary. Carrying & lifting equipment should be used as required, e.g. when installing in a loft space.

All CORGI registered installers carry a CORGI identification card (see Fig. 3) and have a registration number. You can check your installer is registered by telephoning 0870 4012300 or writing to:-

1Elmwood, Chineham Business Park, Crockford Lane, Basingstoke. RG24 8WG.

or check online at www.corgi-gas-safety.com

The boiler meets the requirements of Statutory Instrument “The Boiler (Efficiency) Regulations 1993 No 3083” and is deemed to meet the requirements of Directive 92/42/EEC on the energy efficiency requirements for new hot water boilers fired with liquid or gaseous fuels:-

Type test for purpose of Regulation 5 certified by: Notified Body 0087.

Product/Production certified by:

Notified Body 0086.

Ref: 86-BL-647

For GB/IE only.

5.2Benchmark Commissioning Checklist

1.Please ensure that your installer hands you the boiler Installation & Service Instructions with the “Benchmark Commissioning Checklist sections completed. The details in the Checklist will be required in the event of any warranty work. Keep the instructions in a safe place and ensure that the Service Interval Record at the back is completed at each service visit.

8© Baxi Heating UK Ltd 2008

Page 8
Image 8
Baxi Potterton Promax 15/2 warranty Legislation