
14EUROPOWER PMP1000/PMP4000/PMP6000 User Manual
4.Installation
4.1 Mains connection
The mains connection is made using the enclosed power cord and a standard IEC receptacle. It meets all of the international safety certification requirements.
Blown fuses must be replaced by fuses of the same type and rating.
◊Please make sure that all units have a proper ground connection. For your own safety, never remove or disable the ground conductor from the unit or of the AC power cord.
4.2 Audio connections
The inputs and outputs of your BEHRINGER EUROPOWER are unbalanced 1/4" mono
◊Please ensure that only qualified personnel install and operate the PMP. During installation and operation, the user must have sufficient electrical contact to earth. Electrostatic charges might affect the operation of the unit.
Unbalanced ¼" TS connector
Strain relief clamp
Sleeve
Tip
Sleeve (ground/shield)
Tip
(signal)
Fig. 4.1: ¼/4" TS connector
Balanced ¼" TRS connector
strain relief clamp
sleeve ring tip
sleeve ground/shield
ring cold
tip
hot (+ve)
For connection of balanced and unbalanced plugs, ring and sleeve have to be bridged at the stereo plug.
Fig. 4.2: ¼/4" TRS connector
Balanced use with XLR connectors
21
3
input
1 = ground/shield
2 = hot (+ve)
3 = cold
12
3
output
For unbalanced use, pin 1 and pin 3 have to be bridged
Fig. 4.3: XLR connectors