14EUROPOWER PMP1000/PMP4000/PMP6000 User Manual

4.Installation

4.1 Mains connection

The mains connection is made using the enclosed power cord and a standard IEC receptacle. It meets all of the international safety certification requirements.

Blown fuses must be replaced by fuses of the same type and rating.

Please make sure that all units have a proper ground connection. For your own safety, never remove or disable the ground conductor from the unit or of the AC power cord.

4.2 Audio connections

The inputs and outputs of your BEHRINGER EUROPOWER are unbalanced 1/4" mono jacks—except for the mono channel line inputs, which are balanced 1/4" stereo jacks. Of course, all inputs and outputs work with both balanced and unbalanced connectors. The tape in and outputs are on RCA connectors.

Please ensure that only qualified personnel install and operate the PMP. During installation and operation, the user must have sufficient electrical contact to earth. Electrostatic charges might affect the operation of the unit.

Unbalanced ¼" TS connector

Strain relief clamp

Sleeve

Tip

Sleeve (ground/shield)

Tip

(signal)

Fig. 4.1: ¼/4" TS connector

Balanced ¼" TRS connector

strain relief clamp

sleeve ring tip

sleeve ground/shield

ring cold (-ve)

tip

hot (+ve)

For connection of balanced and unbalanced plugs, ring and sleeve have to be bridged at the stereo plug.

Fig. 4.2: ¼/4" TRS connector

Balanced use with XLR connectors

21

3

input

1 = ground/shield

2 = hot (+ve)

3 = cold (-ve)

12

3

output

For unbalanced use, pin 1 and pin 3 have to be bridged

Fig. 4.3: XLR connectors