Bertazzoni H304GGVNE PERFORMANCE CHECKLlST, Final Preparation, A 2” 5 cm B 3”7,6 cm D 8”20,3 cm

Models: H304GGVNE H304GGVCR H304GGVVI

1 27
Download 27 pages 16.53 Kb
Page 11
Image 11
A 2”( 5 cm)

3.Flexible Connections:

a)If the unit is to be installed with flexible couplings and/or quick disconnect fittings, the installer must use a heavy-duty, AGA design-certified commerciai flexible connector of at least 1/2" (1.3 cm) ID NPT (with suitable strain reliefs) in compliance with ANSI Z21.41 and Z21.69 standards.

b)In Massachusetts: The unit must be installed with a 36" (3-foot) long flexible gas connector.

c)In Canada: CAN 1-6.10-88 metal connectors for gas appliances and CAN 1-6.9 M79 quick disconnect device for use with gas fuel.

CAUTlON: Leak testing of the appliance shall be conducted according to the manufacturer's instructions. Before placing the oven into operation, always check for leaks with a soapy water solution or other acceptable method. DO NOT USE AN OPEN FLAME TO CHECK FOR LEAKS!

A 2”( 5 cm)

B 3”(7,6 cm)

D 8”(20,3 cm)

A properly-grounded horizontally- mounted electrical receptacle should be installed no higher than 3" (7.6 cm) above the floor, no less than 2”( 5 cm) and no more than 8”(20,3 cm) from the right side (facing product). Check all local code requirements.

An agency-approved, properly-sized manual shut-off valve should be installed no higher than 3" (7.6 cm) above the floor and no less than 2”( 5 cm) and no more than 8”(20,3 cm) from the left side (facing product). To connect gas between shut-off valve and regulator, use agency-approved, properly sized flexible or rigid pipe. Check all local code requirements.

PERFORMANCE CHECKLlST

All burners are tested before leaving the factory. There are no adjustments for the burners if connected according to the information on the rating plate. Check each burner for proper operations. Flames should be blue in all settings. If service is required, contact your dealer for the name of their authorized service agency. Gas conversions and initial installation are not the responsibility of the manufacturer.

The installer should carry out the following performance checks. Refer to instructions below.

1.Check surface burner ignition.

2.Check air shutter adjustment (only for oven and broiler burner)- sharp blue flame, no yellow tipping, sooting or flame lifting

3.Check low flame adjustment

4.Check broiler and oven ignition - all burner ports.

5.Check for gas leaks (odors) at all gas connections.

6.Check oven bake and convection bake function.

FINAL PREPARATION

1.Some stainless steel parts may have a plastic protective wrap which must be removed. The interior of the oven should be washed thoroughly with hot soapy water to remove film residues and any installation dust or debris before using it for food preparation, then rinsed and wiped dry. Solutions stronger than soap and water are rarely needed.

2.All stainless steel body parts should be wiped with hot, soapy water and with a liquid cleaner recommended for use with stainless steel If buildup occurs, do not use steel wool, abrasive cloths, cleaners, or powders! If it is necessary to scrape stainless steel to remove encrusted materials, soak with hot, wet cloths to loosen the

material, then use a wood or nylon scraper. Do not use a metal knife, spatula, or any other metal tool to scrape stainless steel! Scratches are almost impossible to remove.

NOTE: These installation instructions should remain with the unit for future reference. The electrical diagram is located in the backside or the appliance.

11

Page 11
Image 11
Bertazzoni H304GGVNE, H304GGVVI, H304GGVCR manual PERFORMANCE CHECKLlST, Final Preparation, A 2” 5 cm B 3”7,6 cm D 8”20,3 cm