BILLION BIPAC-7000 ADSL USB Modem

If this test fails consistently and your DSL modem seems not working, check to make sure the VPI and VCI are configured correctly.

This test returns FAIL if the DSL synchronization test failed.

Test ATM OAM End-to-End Loop Back

This test sends ATM OAM F5 End-to-End loop back request cells to the central office equipments through your DSL connection. This test returns PASS if response cell is received. Since your service provider might not support this test, your DSL modem could still work even if this test fails.

If this test return FAIL consistently and your DSL modem seems not working, check to make sure the VPI and VCI are configured correctly.

This test returns SKIPPED if the DSL synchronization test failed.

Test Ethernet connect to ATM

This test returns PASS if the ATM AAL5 module is loaded correctly in your DSL modem. If this test returns FAIL, an internal error has occurred.

This test returns SKIPPED if the DSL synchronization does not return PASS.

Test PPPoE connection

This test returns PASS if your login name and password have passed authentication with your service provider.

If this test returns FAIL, run this test again a few minutes after this test is completed, especially if your PPP connection has just been improperly disconnected. If this test consistently fails, first make sure your login name and password are correct. Remember that login name and password are case sensitive.

This test returns SKIPPED if “PPPPOE connect to Ethernet” test does not return PASS and your DSL modem is configured as PPPOE encapsulation.

This test also returns SKIPPED if “Ethernet connect to AAL5” test does not return PASS and your DSL modem is configured as PPPOA encapsulation.

Test PPP Layer connection

This test returns PASS if your DSL modem has been assigned a valid IP address by

22

Page 26
Image 26
Billion Electric Company 7000 Test ATM OAM End-to-End Loop Back, Test Ethernet connect to ATM, Test PPPoE connection