![Quick installation guide for LB9217A and LB9218A](/images/new-backgrounds/108040/1080401x1.webp)
Quick installation guide for LB9217A and LB9218A
This installation guide gives
Selecting a module combination with LB9217A and LB9218A
LB9217A can be plugged in with the combination of different copper and fiber optic connectors. Following is a list of various modules pertains to this
Modules: Ports
LB9213A: 8TX
LB9219A: 4TX + 4FX (SC)
LB9216A: 6TX + 2FX (ST)
LB9218A: 6TX + 2FX (SC)
LB9214A: 8FX (ST)
LB9215A: 8FX (SC)
LB9007C-ST-R2: 1FX (ST)
Figure 1: Front Panel of the Chassis, LB9217A.
Follow These Steps for Installation:
Step 1: Turn off the power before installation.
Step 2: Unscrew the cover plates of the module slots. Retain both the screws and the cover plates. The plates can be reinstalled if the module is removed.
Step 3: Remove the module from the
Step 4: Snap in the
Step 5: Tighten the screws retained from original cover plate.
Step 8: Restore power.
_____________________________________________________________________
Figure 2: Removal of cover plate | Fiber module being installed |
Select a proper site for LB9217A, Connect AC power cord to the receptacle on LB9217A & standard AC outlet. Turn the switch on then to connect network with proper CAT 5 or fiber cable.
Figure 3: Internal power: Connect the supplied AC power cord to the receptacle on the back of the switch, and then plug it into a standard AC outlet with a voltage range from 100 to 240 Vac.
CUSTOMER Order
INFORMATION Mail order: Black Box Corporation, 1000 Park Drive, Lawrence, PA