operating.
Cleaning the condenser
Warning symbol turns on with certain intervals to remind that the condenser needs cleaning.
Door open
Dryer door open symbol lights up.
Time delay
With the “Time delay” function you can delay the programme start up to 24 hours.
1.Open the loading door and put the laundry in.
2.Set the drying programme and spin speed, and if required, select the auxiliary functions.
3.Press “Time delaying” buttons “+” and
4.Press “Start/Pause/Cancel” button. Then the time delay starts to count down. The Time delay symbol lights up. Start symbol lights up.
The “:” in the middle of the displayed time delay will start flashing.
More laundry may be loaded or taken out during the time delay period. At the end of the time delay countdown process, time delay symbol fades, drying process starts and the programme duration is displayed. The time on the display is the total of normal drying time and delay time.
Time delay is started by pressing the start/ pause/cancel button in the exemplary figure.
Changing the delay time
If you want to change the time during the countdown:
1.Press “Start/Pause/Cancel” button for 3 seconds to cancel the programme. Time delay function must be set again for the required time.
2.Press Time delay buttons “+” or
3.Press “Start/Pause/Cancel” button. The Time delay symbol lights up. Pause symbol fades. Start symbol lights up.
4.The “:” in the middle of the displayed time
delay will start flashing.
Canceling the time delay
If you want to cancel the time delay countdown and start the programme immediately:
1.Press “Start/Pause/Cancel” button for 3 seconds to cancel the programme.
2.Then, press “Start/Pause/Cancel” button to
start the desired programme.
Starting the programme
1.Press “Start/Pause/Cancel” button to start the programme.
2.“Start/Pause” symbol will light up to indicate that the programme has started and “:” symbol between the remaining time will continue flashing.
Progress of programme
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Drying |
| Wardrobe |
| Anti- | |||
|
|
| (Extra) |
| creasing | ||
| Iron |
| Ventilation |
|
|
The progress of a running programme is shown through a number of symbols on the screen. At the beginning of each programme step, the relevant symbol in the series of symbols will light up and thus, all symbols will remain lit up at the end of the programme. The symbol that is lit up at the far right of the series of symbols indicates the step that is being carried out.
“Drying”:
- Lights up in all programmes apart from drying
and ventilation.
“Iron Dry”:
-Starts to illuminate when the drying degree reaches “iron dry” step and remains illuminated until the next step.