INSTALLATION INSTRUCTIONS

READ THIS CAREFULLY BEFORE STARTING THE INSTALLATION

IMPORTANT:

To enable the installer to make a quality installation and to minimize installation time, the following suggestions and tests should be done before the actual unit installation is started:

CAUTION: Equipment

Electrical Damage

DO NOT plug in or energize this appliance until all Installation Instructions are read and followed. Damage to the Brewer will occur if these instructions are not followed.

CAUTION: Unstable

Equipment Hazard

UNPACKING & INITIAL INSPECTION

1.Unpack the unit. Inspect all components for completeness and condition. Ensure that all packing materials have been removed from the unit.

2.Verify that the Spray Head and Spray Head Gasket are properly installed. (See page 13)

LEVELING THE UNIT

1.Verify that an adjustable leg is installed at each corner of the brewer.

2.Set Brewer in its operating location.

3.Level the Brewer. A spirit level should be placed on the top of the unit, at the edge, as a guide when making level adjustments.

4.Level the unit from left to right and front to back by turning the adjustable feet. Be sure all four feet touch the counter to prevent tipping.

PLUMBER’S INSTALLATION INSTRUCTIONS

It is very important for safety and for proper operation that the brewer is level and stable when standing in its final operating position. Provided adjustable, non-skid legs must be installed at each corner of the unit. Failure to do so will result in movement of the brewer which can cause personal Injury and/ or damage to brewer.

NOTE: Water supply inlet line must meet certain minimum criteria to insure successful operation of the brewer. Bloomfield recommends 1/4" copper tubing for installation of less than 12 feet and 3/8" for more than 12 feet from a 1/2" water supply line.

1.Brewer should be connected to a POTABLE WATER, COLD WATER line. Flush water line before connecting to brewer.

2.DO NOT use a saddle valve with a self-piercing tap for the water line connection. Such a tap can become restricted by waterline debris. For systems that must use a saddle tap, shut off the main water supply and drill a 3/16” (minimum) tap for the saddle connection, in order to insure an ample water supply. Remember to flush the line prior to installing the saddle.

3.The brewer must be installed on a water line with average pressure between 20 PSI and 90 PSI. If your water pressure exceeds 90 PSI at anytime, a pressure regulator must be installed in the water supply line to limit the pressure to not more than 90 PSI in order to avoid damage to filters, lines and solenoid.

4.A water shut-off valve should be installed on the incoming water line in a convenient location (Use a low restriction type valve, such as a 1/4-turn ball valve, to avoid loss of water flow thru the valve.

4

Page 6
Image 6
Bloomfield 2030 owner manual Installation Instructions, Equipment Hazard, Unpacking & Initial Inspection, Leveling the Unit

2030 specifications

Bloomfield 2030 is an ambitious vision for the future of urban living, focusing on sustainability, connectivity, and enhanced quality of life for its residents. This forward-thinking initiative aims to transform Bloomfield into a model smart city, integrating advanced technologies and innovative practices to create a vibrant community.

One of the main features of Bloomfield 2030 is its commitment to sustainability. The city plans to implement green infrastructure, including extensive urban parks, green roofs, and vertical gardens. These initiatives will promote biodiversity, improve air quality, and reduce urban heat. Additionally, renewable energy sources such as solar and wind power will be harnessed to meet the city's energy needs, with the goal of achieving net-zero emissions by 2030.

Another key characteristic of Bloomfield 2030 is its focus on smart technology. The city will leverage Internet of Things (IoT) devices to enhance urban services and improve the overall efficiency of municipal operations. Smart traffic management systems will optimize traffic flow and reduce congestion, while connected sensors will monitor air quality and noise levels to help maintain a healthy environment. Public safety will be enhanced through the use of smart surveillance and emergency response systems, ensuring residents feel secure in their community.

In addition to environmental and technological advancements, Bloomfield 2030 places a strong emphasis on community engagement and inclusivity. The city plans to incorporate citizen feedback into urban planning initiatives, fostering a sense of ownership and belonging among residents. Diverse housing options, including affordable units and co-housing projects, will cater to a wide range of demographics, ensuring that all community members have access to quality living conditions.

Transportation will also undergo significant transformations under the Bloomfield 2030 plan. The city aims to promote active transportation methods, such as walking and cycling, by developing extensive bike lanes and pedestrian pathways. Additionally, a robust public transit system will connect different neighborhoods, reducing reliance on personal vehicles and lowering carbon emissions.

In summary, Bloomfield 2030 represents a futuristic vision of urban development that prioritizes sustainability, smart technology, community involvement, and efficient transportation. By embracing these principles, Bloomfield will create a thriving, inclusive, and resilient city that meets the needs of its residents while protecting the environment for future generations.