Manuals
/
Brands
/
Household Appliance
/
Boiler
/
Bosch Appliances
/
Household Appliance
/
Boiler
Bosch Appliances
14/19CBI, 9/14CBI
- page 43
1
43
44
44
Download
44 pages, 805.41 Kb
43
Contents
Main
9/14CBi, 14/19CBi, 19/24CBi
WALL MOUNTED BOILERS FOR CENTRAL HEATING AND INDIRECT SUPPLY OF DOMESTIC HOT WATER
INSTALLATION AND SERVICING INSTRUCTIONS
APPLIANCE OUTPUTS
2. Introduction1. Installation Regulations
Contents
Fig. 1. Water flow diagram.
3. Technical Data
Page
4. Siting The Appliance
Fig. 2. Appliance casing dimensions and required clearances.
* Space required for installation and servicing. Refer to Table 7
Fig. 3. Appliance pipework connections
6. Air Supply5. Flue terminal positions
Fig. 4. Siting of the flue terminal.
8. Domestic Hot Water7. System
Fig. 5. System layout if using Honeywell 'Y' plan
Fig. 7. Fully pumped sealed system.
Fig. 6. System layout if using Honeywell 'S' plan
Fig. 8. Sealed system filling and make-up.
10. Electrical
Fig.9 . Mains electricity and controls
9. Gas Supply
Fig.10. Boiler wiring diagram
Control Board
Fig.11 . System wiring diagram
Cable clamp
Control Board
Earth post
OUTSIDE OF BOILER INSIDE OF BOILER
Fig. 12a. Boiler Assembly 9/14CBi Shown set for Rear Only flue kit
Page
11. Installation of the Boiler with a Rear Only Flue Kit
11.1 Unpacking the Boiler
11.1.2 Site Preparation
11.1.3 Fixing Holes and Flue Opening
11. Installing The Appliance
Fig. 14 . Flue assembly - Rear Only Flue Kit
Fig. 13a . Wall plate
Fig. 13b . Flue and wall plate
Fig. 13 . Fixing the wall mounting plate.
Fig. 14a . Rear only flue assembly
Fig. 14b . Rear of casing
Fig. 16 . Fan/Flue hood Assembly with Rear Only Flue Kit
Fig. 15 . Fixing the appliance to the wall mounting plate.
11.1.8 Completion of the Installation
REFER NOW TO SECTION 12 - COMMISSIONING THE APPLIANCE
11.2 Installation of the Boiler with a Telescopic Horizontal Flue Kit
11.2.1 Unpacking the Boiler
11.2.2 Site Preparation
11.2.3 Fixing Holes and Flue Opening
11.2.4 Boiler Preparation
Fig.20 . Extension Duct.
Fig.21. Flue duct length (side flue). Fig.22 . Flue duct length (rear flue).
Fig.19. Flue turret fixing and combustion sensing point
11.2.6 Telescopic Horizontal Flue Kit up to 750mm in Length
11.2.7 Telescopic Horizontal flue Kit Greater Than 750mm in Length
Fig. 23. Flue bends.
11.2.9 Vertical Adaptor for Horizontal Flues
11.2.10 Fitting of the Flue Assembly without access to the Terminal
11.2.11 Install the Boiler
Fig. 24 - Elbow to Flue Turret Assembly.
Fig.25 Vertical Adaptor
Fig.26 . Terminal assembly for internal fitting of the flue.
Fig. 27 . Fixing the appliance to the wall mounting plate.
11.2.12 Installation of Flue onto Boiler
Fig.29 . Flue Turret Fixing .
Fig. 28 . Fan/Flue hood Assembly with Flue Turret Kit
Fig. 30 . Mains electricity and controls
12. Commissioning The Appliance
Fig. 31. Gas Valve.
14. Inspection And Service
13. Instructions To The User
Fig. 32. User controls.
123 4
Fig. 33a. Inner Casing and control
9/14CBi
15. Replacement Of Parts
Fig. 33b. Inner Casing and control 14/19 and 19/24CBi
Fig. 34 . Inner Casing - Gas and Electric Controls. 9/14CBi shown.
Fig. 35 . Base/Control Board Assembly
15.4.1 Gas Valve
15.4.2 Spark Electrode
15.4.3 Flame Sense Electrode
Fig. 36. Burner Blade Assembly 14/19 and 19/24CBi
Fig. 36a . Burner Blade Assembly 9/14CBi
15.4.5 Control Board
15.4.6 Fan
Fig. 37 . Fan/Flue hood Assembly with Horizontal Flue
Fig. 37a . Fan/Flue hood Assembly with Rear Only Flue
15.4.7 Air Flow Sensor
15.4.8 Temperature Sensor
15.4.9 Overheat Thermostat
Fig. 39. Sensor and Overheat Thermostat
Fig. 40. Air Pressure Switch
Fig. 38 - 9/14CBi Fig. 38a - 14/19 and 19/24CBi +
+
15.4.11 Combustion Chamber Insulation
Fig. 41. Heat Exchanger Baffles in Position on the Heat Exchanger
16. Conversion Instructions
17. Short Parts List
18. Operational Flow Diagram
Protection Systems
19. Fault Finding
LIGHT SITUATION DURING FAULT
FAIL POINT A
FAIL POINT B
No No No
FAIL POINT C
FAIL POINT D
No
FAIL POINT E 'BURNER LOCKOUT'
No
NOTE:Do not attempt to light the boiler with the combustion chamber cover removed.
FAIL POINT F
Page
CONTROLS
BOILER SERIAL No. NOTIFICATION No.
FOR ALL BOILERS CONFIRM THE FOLLOWING
FOR THE CENTRAL H EATING MODE, MEASURE & RECORD
GAS BOILER COMMISSIONING CHECKLIST
SERVICE INTERVAL RECORD
SERVICE 10
SERVICE 9
SERVICE 8
SERVICE 7
Page
www.worcester-bosch.co.uk
Bosch Group